IHSM WellTest Production Editor Overview

In this video, we will review the basic steps for setting up the production editor.
Important Tip: Ensure a zero (0) rate is entered at the beginning of each shut-in period. This should be done before any filtering and is required to distinguish between flow and shut-in periods.

Leave a Reply

Your email address will not be published. Required fields are marked *